thisDot Labs
Our own R&D, in the open
Before we put technology in front of customers, we build and test it ourselves. Here is what we are working on, how far along it is, and where it is going next.
EMS Brain
Prototype, tested in simulationA decision engine for sites with solar, a battery, the grid, and a backup generator.
Every 15 minutes it decides which source should power the site, how much, and what to do with any surplus. Every decision comes with a plain-English reason, so nothing is a black box.
Where it stands: The real-time dispatcher produced the simulated results below. The forecasting model and the day-ahead planner are built but not yet proven on real data.
How it works
- Order of use: solar first, then the battery, then the grid, and the diesel generator only as a last resort
- Discharges the battery in expensive tariff windows to lower what you pay at the meter
- Stores surplus solar and uses it later instead of wasting it
- Switches to island mode in a grid outage and protects the battery
- Designed to add a 24-hour forecast and a daily cost-optimised plan on top
What the simulation showed
- About 20%lower energy bill than a site with no EMS
- About 98%of solar power used on site
- 35,040fifteen-minute decisions across a full year



Simulated industrial site with 1 MW of solar, a 500 kWh battery and a peak load of about 1.6 MW, using synthetic data. Savings are measured against the same site buying all its power from the grid. Real sites will differ, which is why the next step is a pilot on real meter data.
Where we are taking it
Pilot on real data
Run the engine in shadow mode on a real site and compare its decisions with what actually happened.
Right-size the battery
Build a sizing tool. In the simulation a 500 kWh battery trims the highest peak only slightly at a 1.6 MW site, so size matters.
Prove the forecasts
Test the forecasting model against simple baselines on real load data. The simulation currently uses perfect forecasts.
Go live safely
Connect to inverters and battery systems through our gateways, with safe fallbacks if anything fails.
Plug into the dashboard
Feed its decisions and reasons into the thisDot IoT dashboard and AI assistant.
ModLink RF
Firmware prototype, in developmentA wireless node for meters and machines that are hard to wire.
A small, low-power device that sits next to an existing energy meter or machine, reads its data and sends it over long-range radio to a gateway. No new cables across the plant.
Where it stands: Reading Modbus devices and building the encrypted message are written. The radio driver and saving settings are still placeholders, and the security needs hardening before field use.
How it works
- Reads any Modbus RTU device over RS-485, such as energy meters, drives, and sensors
- Encrypts every reading with AES-128 before it leaves the device
- Sends it over LoRa radio, chosen for long range and low power
- Sleeps between readings to save battery
- First-time setup is wireless from a data concentrator, so no laptop or cable is needed
Built with
- Modbus RTUreads the meters you already have
- AES-128encrypted readings
- LoRalong range, low power
- Node ID · 1 byte
- Random IV · 16 bytes
- Encrypted readings + timestamp · N × 16 bytes
Where we are taking it
Real radio driver
Replace the placeholder with a working driver for the LoRa chip, then test range on the bench and on site.
Harden security
A unique key per device, a hardware random number for every message, authenticated encryption, and protection against replayed messages.
Settings that survive power-off
Store the configuration in flash memory and finish the wireless first-time setup.
The gateway side
Build the concentrator that receives, decrypts, and forwards readings to the thisDot platform over MQTT.
Field trial
Run a few nodes on a real site and measure range and battery life.
Want to pilot something with us?
We are looking for early partners with real sites and real data. If you have a plant, a building, or a gateway project, tell us about it.