thisDot Labs

Our own R&D, in the open

Before we put technology in front of customers, we build and test it ourselves. Here is what we are working on, how far along it is, and where it is going next.

EMS Brain

Prototype, tested in simulation

A decision engine for sites with solar, a battery, the grid, and a backup generator.

Every 15 minutes it decides which source should power the site, how much, and what to do with any surplus. Every decision comes with a plain-English reason, so nothing is a black box.

Where it stands: The real-time dispatcher produced the simulated results below. The forecasting model and the day-ahead planner are built but not yet proven on real data.

How it works

  • Order of use: solar first, then the battery, then the grid, and the diesel generator only as a last resort
  • Discharges the battery in expensive tariff windows to lower what you pay at the meter
  • Stores surplus solar and uses it later instead of wasting it
  • Switches to island mode in a grid outage and protects the battery
  • Designed to add a 24-hour forecast and a daily cost-optimised plan on top

What the simulation showed

  • About 20%lower energy bill than a site with no EMS
  • About 98%of solar power used on site
  • 35,040fifteen-minute decisions across a full year
Bar chart comparing monthly energy cost with and without the EMS across a simulated year
Monthly cost with and without the EMS. Savings are largest in the sunny months.
Line chart of average power by hour showing the grid import dropping during peak tariff windows
Average power by hour. The shaded gap is demand covered by solar and the battery.
Stacked bar chart of monthly energy by source: solar, battery, grid and generator
Where the energy came from each month.

Simulated industrial site with 1 MW of solar, a 500 kWh battery and a peak load of about 1.6 MW, using synthetic data. Savings are measured against the same site buying all its power from the grid. Real sites will differ, which is why the next step is a pilot on real meter data.

Where we are taking it

  1. Pilot on real data

    Run the engine in shadow mode on a real site and compare its decisions with what actually happened.

  2. Right-size the battery

    Build a sizing tool. In the simulation a 500 kWh battery trims the highest peak only slightly at a 1.6 MW site, so size matters.

  3. Prove the forecasts

    Test the forecasting model against simple baselines on real load data. The simulation currently uses perfect forecasts.

  4. Go live safely

    Connect to inverters and battery systems through our gateways, with safe fallbacks if anything fails.

  5. Plug into the dashboard

    Feed its decisions and reasons into the thisDot IoT dashboard and AI assistant.

Want to pilot something with us?

We are looking for early partners with real sites and real data. If you have a plant, a building, or a gateway project, tell us about it.

Talk to us